HAECO HKIA – New Switch Room for Centralized Chiller System

Goldwave Steel Structure Engineering Limited > Projects > Addition & Alteration > HAECO HKIA – New Switch Room for Centralized Chiller System

HAECO HKIA - Design, Supply and Install of New Switch Room and Framework for Centralized Chiller System

Design and Build the new steel structure switch room for the new cooling tower. The Switch room load is transferred to the existing R.C. slab through the proposed steel frame, supported by the existing R.C. beams and ultimately transferred to the foundation through columns.

Scope of work :

  1. Demolition of existing facilities 
  2. Construct new switch room and frame work for the centralized chiller system
  3. GMS structure works for Cooling Towers, TES Tanks and Steel Staircases

 

 

CLIENT / MAIN CONTRACTOR

HAECO, HKIA

SCOPE OF WORK

Design, Fabricate and Erection

SCHEDULE

Completed : End April 2019