Passenger Bridges, Tai Wai MTR Station

Goldwave’s project team has a wealth of experience with erecting/installing large and wide span footbridges all over Hong Kong. This project comprises two pedestrian bridges at maximum 70 meters in length and are connected to existing building structure located on top of Tai Wai MTR station. These were completed in two overnight, professionally coordinated onsite sessions

Bridge Length : Footbridge 1 (50 meters) ; Footbridge 2 (70 meters)

Tonnage           : Footbridge 1 (327 tons); Footbridge 2 (271 tons)

 

 

CLIENT / MAIN CONTRACTOR

Hip Seng Construction Co. Ltd.

SCOPE OF PROJECT

Design, Supply, Install & Build

SCHEDULE

Completed : Q1 2021