Sheet Piles for Circular Structure

The circular structure was composed of 5,100T of sheet piles of length from 38 to 42 meters. In order to secure high precision in accuracy of the drilling process during fabrication, Goldwave developed its own CNC drilling equipment to accomplish the mission.

SCOPE OF PROJECT  

Supply and Fabrication