Sheet Piles for Circular Structure

The circular structure was composed by 5,100T of sheet piles of length from 38 to 42 meters. In order to secure the high precision of accuracy of drilling process during fabrication, Goldwave developed its own CNC drilling equipment to achieve this success delivery.  

SCOPE OF PROJECT  

Supply and Fabrication