Goldwave’s ingenious heavy lifting system creates a breakthrough to turn “impossible mission” to possible solution. In this project, Goldwave design, fabricate and hoist up 5 irregular service decks within extreme compact spacing (from approx. 10-18 meters) from 5th floor to 28th floor to support the construction of a massive concrete transfer slab permanently in place at 29th floor.

The service decks are also as serves safety working platform for site workers to carry out remaining works for the transfer slap installation. 5 temporary protection platforms are installed as safety measure to mitigate the risk of falling objects to protect workers during the construction period of service decks.  

SCOPE OF PROJECT  

Design, supply, fabrication and installation (Heavy Lifting)