F2 Water Channel for Third Runway, Hong Kong International Airport

Posted on December 8th, 2021

Goldwave had been successfully delivered a faster, safer, cost effective and environmentally friendly solution spanning from structural design, selection of high mobility of decking system which beyond the expectation of client. This successful project brings us the next opportunity for a new temporary platform project.

SCOPE OF PROJECT  

Supply, Installation and Demolition of Temporary Deep Jet Mixing Platform – F2 Water Channel for Third Runway

Tin Wing Light Rail Station (Heavy Lifting & Skidding System for Temporary Platform)

Posted on December 8th, 2021

Kai Tak NKIL 6568 (Heavy Lifting System – Temporary Working Platform)

Posted on December 8th, 2021

Goldwave’s ingenious heavy lifting system creates a breakthrough to turn “impossible mission” to possible solution. In this project, Goldwave design, fabricate and hoist up 5 irregular service decks within extreme compact spacing (from approx. 10-18 meters) from 5th floor to 28th floor to support the construction of a massive concrete transfer slab permanently in place at 29th floor.

The service decks are also as serves safety working platform for site workers to carry out remaining works for the transfer slap installation. 5 temporary protection platforms are installed as safety measure to mitigate the risk of falling objects to protect workers during the construction period of service decks.  

SCOPE OF PROJECT  

Design, supply, fabrication and installation (Heavy Lifting) 

Taiwai Station Property Development (Foundation & Temporary Work)

Posted on December 8th, 2021

Along with this vast permanent structure development and bridges interlink construction, the project demanded for substantial scale of temporary platforms, excavation lateral support and steel ramp to support the construction of new podiums and the basement structure adjacent to the existing rail track of East Rail. Total steel consumption for temporary and permanent works reached 5,000 Tons. 

SCOPE OF PROJECT 

Design, Supply, Fabrication and Installation  

HK-Zhuhai-Macau Bridge, Hong Kong Section (Sheet Piles)

Posted on December 8th, 2021

Sheet Piles for Circular Structure

The circular structure was composed by 5,100T of sheet piles of length from 38 to 42 meters. In order to secure the high precision of accuracy of drilling process during fabrication, Goldwave developed its own CNC drilling equipment to achieve this success delivery.  

SCOPE OF PROJECT  

Supply and Fabrication