Taiwai MTR Station Property Development (Pedestrian Steel Bridges )

Posted on December 14th, 2021

Goldwave’s project team has a wealth of experience with installing large and wide span footbridges all over Hong Kong. This project comprised two pedestrian bridges at maximum 70 meters in length and were connected to existing building structure located on top of Tai Wai MTR station. These were completed in two overnights, professionally coordinated onsite sessions.

2 newly built bridges were to be connected the Interchange across Che Hung Mui Road and Mei Tin Road. 

SCOPE OF PROJECT 

Design, Supply, Fabrication and Installation
No. of Bridge: 2