West Kowloon Express Railway Link Terminus Commercial Development

Posted on December 8th, 2021

Commercial Complex and Office Towers  

We are incredibly proud to offer our expertise for the city’s largest-ever commercial development which worths an estimated HK$70 billion. The project scope covers significantly in material supply, fabrication, and installation of hundreds of built-up cruciform stanchions for the superstructure of 2 commercial-office towers in phase 1. The towers are at the height of 148 and 122 meters respectively constructed in the 59,735 sqm site atop of the High-Speed West Kowloon Express Railway Link Terminus. With our proven track record of delivering faster and safer projects, we can’t wait for the second phase to commence.   

The project’s total gross floor area is 3.16 million square feet providing two towers of grade A offices, facilities for retails, high-quality green public open space, and a trail that integrates with the nearby West Cultural District thus creating an easy access to the waterfront. The highlight of an outdoor observation deck with views of Victoria Harbour on the top floor of the tallest building will be open to public. 

Our client, Sun Hun Kai Properties believes that this iconic project can boost commerce, trades, tourism and benefits the residents nearby alongside the West Kowloon Cultural District. The shopping plaza and public space are expected to be completed during 2025 with the entire project to be finished off in 2028. 

H Zentre, 15 Middle Road, Tsim Sha Tsui

Posted on December 8th, 2021


The plot in Middle Road, a former multi-storey car park next to the Sheraton Hong Kong Hotel and Towers is a unique and well located site to be redeveloped into a 22 Storey Ginza-Style commercial complex of gross floor area 42,000 square meters.

The Developer selected Goldwave’s steel structure solution over traditional concrete construction due to the rapid speed of construction schedule, generate higher building efficiency of usable area which translating into value-added economic benefits.

See more…

Shenzhen Qianhai Chow Tai Fook Financial Tower, China

Posted on December 8th, 2021

200 Meters Mixed Use Commercial Complex (45-storey) 

Followed by a great deal of effort had been put into promoting the added value of steel structure. Goldwave was honored to be selected by Hip Hing Construction (China) Co. Ltd. as client’s nominated structural steel contractor to design, fabricate and erect the superstructure of a 200 meters height (45-storey) mixed use commercial complex situated at the prime location in Guiwan area, Qianhai commercial district. 

This project crafted a new milestone of Goldwave to set our first footprint in the map of Greater China. 

SCOPE OF PROJECT

Structural design, supply, fabrication and erection

98 How Ming Street, Integrated Commercial Complex and Grade A Office Development

Posted on December 8th, 2021

Commercial, Office, Retail Development 

Goldwave’s Smart Steel Structure Solution designed for this Mega Commercial Complex demonstrates to the Client how a steel structure can outperform a conventional reinforced concrete solution for this type of project. Faster construction time, greater precision on site due to factory controlled fabrication off site, higher productivity on site, fewer and smaller columns creating more efficient use of area. Earning the trust of Sun Hung Kai Properties as a Long Term Strategic Partner. 

 

 
SCOPE OF PROJECT

Supply, Fabrication and Installation of structural steel stanchions

Mixed-use Commercial Twin Composite Towers, Cheung Sha Wan NKIL6505

Posted on December 7th, 2021

120 Meters in height and 8,000 Tons of structural steel 


Goldwave offered a one-stop-shop design and build solution(s) for two highly efficient steel frame twin towers. The use of a steel structure could create an additional 5% net leasable area and a ceiling height of up to 3 meters. Basically, the slimmer main columns maximized the flexibility of the internal layouts and enhanced users’ experience. 

SCOPE OF PROJECT  

Structural design, Supply, Fabrication, and installation 

Apple Store, Nanjing, China – Steel Spiral Staircase

Posted on December 8th, 2021

1st Signature Steel Spiral Stair cases at Apple Store, Nanjing, China


This masterpiece is fabricated in highly dimensional accuracy within 3mm tolerance. 

Highlight: 

  • Pose free steel spiral stair cases 
  • 16mm steel plate, 90 mm stringer, flush hand rail  
  • Total Height: 5.4 meters 
  • Outer Diameter: 3.2 meters  

SCOPE OF PROJECT  

Supply, Fabrication and Installation  

H-code Pottinger Street, Central

Posted on December 8th, 2021

H Code is a pioneering leisure development that is designed for flexibility and versatility. It is located at upper Pottinger Stone Street in Central, an area of Hong Kong known for its ultra-high density and compact business nature. 

The site was considered not buildable by using traditional building methods because of its site constraints. Goldwave provided an effective steel frame solution which overcame the challenges of geographical complexity as the site is located on a slop; low capacity foundation had been built and tiny site area provided very limited storage for building materials. The 22-storey building structure of 12,632 square meters of gross floor area was completed in 14 months. H-code itself won the building design award from the American Institute of Architects. 

SCOPE OF PROJECT  

Structural design, Fabrication and Installation of structural steel frame 

New World Center Remodeling, Tsim Sha Tsui

Posted on December 8th, 2021

Goldwave is honored to be awarded the fabrication and erection of H2 Tower Steel Stanchion for the New World Center Remodeling Project.

K11 Atelier, 704-730 King’s Road – Office Development

Posted on December 8th, 2021

Goldwave is honored to be awarded for the fabrication and erection for structural steel (Stanchion) works. 

SCOPE OF PROJECT 

Supply, Fabrication and Installation of structural steel stanchions  

Skycity, Hong Kong International Airport (Passenger Steel Bridge, Deck Over)

Posted on December 15th, 2021

Design, Supply, Fabrication and Installation of Passenger Footbridge and Deck Over at SkyCity Site A2, A3

SCOPE OF PROJECT

Supply, Fabrication and Installation