Union Church, Hong Kong

Posted on December 8th, 2021

Goldwave closely cooperates with the design architect and utilizes its strong BIM modeling skills to work out the structural supporting system, including the 10nos. of tree columns with its arch roof top, and the complex connection details, which makes the final output both esthetically pleasant and structurally robust. 

SCOPE OF PROJECT  

Supply, Fabrication and Installation of Tree Columns & Steel structure for Podium  

MTRC Shatin to Central Link – Contract 1126 (Wanchai Swimming Pool)

Posted on December 8th, 2021

Goldwave was honored to be selected by Kaden Construction to fabricate and install the mega steel roof truss and diverse structural steel works for the project of Re-provisioning of Harbour Road Sports Center & Wanchai Swimming Pool.

SCOPE OF PROJECT 

Supply, Fabrication and Installation 

The Hong Kong Award For Young People Jockey Club Duke of Edinburgh Training Camp, Tai Po

Posted on December 8th, 2021

Goldwave outperformed competitors over the capabilities of structural design, value engineering and our proven experience of constructing mega steel structure and roof. The project was awarded in Feb 2018. 

SCOPE OF PROJECT 

Design, Supply, Fabrication and Installation  

Hong Kong Golf & Tennis Academy, Pak Kong (Steel Towers)

Posted on December 8th, 2021

SCOPE OF PROJECT

Supply, Fabrication and Installation of steel towers