Union Hospital (Building Extension)

Posted on December 8th, 2021

The Phase II extension of the Union Hospital included four additional floors to be built on top of the existing hospital which surgery facilities in operation. Goldwave’s outperformed alternative steel frame solution and construction methodology mitigated the big concern of disruption of noise and smoke disruption.

The extension occupies a total floor area of 6,000sqm and accommodates 100 extra beds, a centre for patients undergoing minor surgery, consultation rooms for specialists, and offices.

SCOPE OF WORK

Supply, Fabrication and Installation of structural steel frame

Modular House Steel Frame

Posted on December 8th, 2021

Project Include:

  • Shenzhen Quarantine Hotel (150 units of Modular House)
  • CSCEC International Hotel (128 units of Modular House)
  • CSCEC Health Station (152 units of Modular House)
  • Hong Kong Penny’s Bay Quarantine Center Phase IV – Corridor Module (1,728 units of Modular House)
  • Hong Kong Penny’s Bay Quarantine Center Phase IV – Staircase Module (490 units of Modular House)
  • Hong Kong Kai Tak Quarantine Center – Corridor Module (384 units of Modular House)

SCOPE OF PROJECT

Supply and Fabrication

Redevelopment of Kwong Wah Hospital (KIL 10748)

Posted on December 8th, 2021

2,100 Tons Large Structural Steel Frame comprising two complete floors for a composite redevelopment building

Goldwave’s in-house Special Project Team was proud to have recently completed a single lift of a 40 meters clear span heavy-strength steel structure frame (S460 grade steel), total weight exceeding 1,000 Tons. By utilizing modern-day technology of  strand jacking methods along with precision equipment, our heavy lifting methodology and technique were designed and implemented around best safety practices, high quality, and cost-effective on-time delivery.

Know more…

Temporary Hospital, Hong Kong

Posted on December 8th, 2021

Steel building frame for MIC compartments

To cope with the emerging demand for temporary medical facility which was put into use in 2020 fall/ winter. Goldwave completed the cabin steel frame within 3 to 4 weeks from contract awarded. Material delivery, 24 hours round-the-clock fabrication off-site towards an uninterrupted installation schedule on-site. 

SCOPE OF PROJECT  

Supply, Fabrication and installation within 2 months 

HKU Chong Yuet Ming Auditorium

Posted on December 8th, 2021

Goldwave was honored to be selected for the construction of works of the New Auditorium at Chong Yuet Ming Amenities Centers at the University of Hong Kong. This was our first project awarded for Health and Education Sector. 

SCOPE OF PROJECT

Supply, Fabrication and Installation of structural steel frame