Goldwave is honored to be selected for the fabrication of the focal iconic Neville Bonner Pedestrian Bridge of extensive deck length 331 meters which forms a stronger connection between the popular South Bank, the future Queen’s Wharf Brisbane precinct, and its key surrounding features.
SCOPE OF PROJECT
Supply and Fabrication of Structural steel frame, exported to Australia from our Jiangmen Factory located in Southern China.
Goldwave successfully delivered a faster, safer, cost-effective and environmentally friendly solution spanning from structural design, selection of high mobility of decking system which exceeded client’s expectation. This successful project brought us the next opportunity for a new temporary platform project.
SCOPE OF PROJECT
Supply, Installation, and Demolition of Temporary Deep Jet Mixing Platform – F2 Water Channel for Third Runway
Followed by the successful delivery of the 1st Offshore Temporary Deep Jet Mixing Steel Platform (1,368 sqm) at F2 Water Channel for the 3rd runway at Hong Kong International Airport in Mar 2021, Goldwave is incredibly proud to have completed the 2nd Offshore Steel Platform (2,781 sqm) at G3 Area in Jan 2022. We were commissioned to accomplish material supply, fabrication, piling, erection of structural steel frame, and the installation of modular decking within a very tight timeframe. The entire project completion time had been significantly reduced safely and efficiently to 70 days.
The biggest challenge of this project was carrying out the offshore work under the huge limitations of road access, working hours, and rigid safety regulations within the airport area. Our key success came from our wreath of people, whose extensive experience in dedicated planning on logistics, construction sequence and methodology covering the whole system, high-quality off-site fabrication control, erection of piping, erection of steel frame, and installation of modular steel decks under such extreme conditions contributed to a great project delivery.
SCOPE OF PROJECT
The circular structure was composed of 5,100T of sheet piles of length from 38 to 42 meters. In order to secure high precision in accuracy of the drilling process during fabrication, Goldwave developed its own CNC drilling equipment to accomplish the mission.
SCOPE OF PROJECT
Supply and Fabrication