Cellular Beam

Posted on December 13th, 2021

MEGA Plus – SUNeVision iAdvantage Data Center, Tseung Kwan O Data Center

Posted on December 8th, 2021

Followed by the success of promoting the benefits of steel structure to client’s project, the mixed-use commercial development in 98 How Ming Street, and the recent success in project delivery of Government Data Center in Cheung Sha Wan, Goldwave was honored to be the structural steel contractor for structural design, fabrication, and installation of phase I development. We strongly believe that our effective steelwork proposal and solid project references will be considered with high degree of confidence for the next phase of development.

Mixed-use Commercial Twin Composite Towers, Cheung Sha Wan NKIL6505

Posted on December 7th, 2021

120 Meters in height and 8,000 Tons of structural steel 


Goldwave offered a one-stop-solution design, material supply, steel components fabrication, and build for two highly efficient steel frame twin towers of total tonnage reach 8,000 tons. The use of steel structure created an additional 5% net leasable area and a ceiling height of up to 3 meters. The value-engineered design of slimmer main columns maximizes the flexibility of internal layouts and enhances the greater satisfactory of user’s experience.

The proposed commercial development comprises 2 commercial towers (Tower A and B) with approximately 30 floors’ storeys, with ground floor level for the driveway and access to adjoining public road and 3-level of the basement for car parking/ loading and unloading bay. The total height of towers from the proposed ground floor level (+6.65mPD) to the main roof is approximately 125m. The towers are linked by a two-storey high podium, which is comprised of retail shops, a podium garden, and transformer rooms. 1.5m soil load is considered as provisional podium garden loading. 3F is mainly for E&M plant rooms. From 5F to 30F are typical floors for office use. There are three basement floors for car parks. Heavy good vehicles (HGV and EVA are designed to travel on the proposed ground floor (G/F) level only.

The building will be composed of two different structural materials and reinforced concrete. Typical office floors will be built by structural steel frames with a reinforced concrete central core. The structural slab is a reinforced concrete slab with steel decking as temporary formwork.

SCOPE OF PROJECT  

Structural Steel Frame Design, Supply, Fabrication and Installation 

Tin Wing Light Rail Station (Heavy Lifting & Skidding System for Temporary Platform)

Posted on December 8th, 2021

Tin Wing Light Rail Station (Pedestrian Steel Bridges)

Posted on December 8th, 2021

SCOPE OF PROJECT

Supply, Fabrication and On-site Erection

Kai Tak NKIL 6568 (Heavy Lifting System – Temporary Working Platform)

Posted on December 8th, 2021

Goldwave’s ingenious heavy lifting system creates a breakthrough to turn “impossible mission” to possible solution. In this project, Goldwave design, fabricates and hoists up 5 irregular service decks within extremely compact spacing (from approx. 10-18 meters) from 5th floor to 28th floor to support the construction of a massive concrete transfer slab permanently in place on the 29th floor.

The service decks also serve as safety working platforms for site workers to carry out the remaining works for the transfer slap installation. 5 temporary protection platforms are to be installed as a safety measure to mitigate the risk of falling objects to protect workers during the construction period of service decks.  

SCOPE OF PROJECT  

Design, supply, fabrication and installation (Heavy Lifting) 

West Rail Yuen Long Station Property Development (YLTL No. 510)

Posted on December 8th, 2021

The Massive Steel Turntable Structure measuring 21 meters in diameter was to rotate the permanent footbridge (46 Meters) and vehicular bridge (52 Meters) to the designated position, which was right above the life operation of Light Rail. This innovative erection method was unprecedented in Hong Kong.

Know more…

H Zentre, 15 Middle Road, Tsim Sha Tsui

Posted on December 8th, 2021


The plot in Middle Road, a former multi-storey car park next to the Sheraton Hong Kong Hotel and Towers was a unique and well-located site to be redeveloped into a 22 storeys Ginza-Style commercial complex of gross floor area 42,000 square meters.

The Developer had selected Goldwave’s steel structure solution over traditional concrete construction due to the rapid speed of construction schedule, it generated higher building efficiency of usable area which translated into value-added economic benefits.

Know more…

Shenzhen Qianhai Chow Tai Fook Financial Tower, China

Posted on December 8th, 2021

200 Meters Mixed Use Commercial Complex (45-storey)

Goldwave was honored to be appointed by Hip Hing Construction (China) Co. Ltd. as the client’s nominated structural steel contractor to design, fabricate and erect the superstructure of a 200 meters height (45-storey) mixed-use commercial complex situated at the prime location in Guiwan area, Qianhai commercial district. 

This project crafted a new milestone of Goldwave to have our first footprints in the map of Greater China. 

SCOPE OF PROJECT

Structural Design, Supply, Fabrication and On-site Erection

98 How Ming Street, Integrated Commercial Complex and Grade A Office Development

Posted on December 8th, 2021

Commercial, Office, Retail Development 

Goldwave’s Smart Steel Structure Solution designed for this Mega Commercial Complex demonstrated specifically how a steel structure solution outperformed a conventional reinforced concrete solution. Faster construction time, greater precision on-site due to factory controlled fabrication off site, higher productivity on site, fewer and smaller columns creating more efficient use of the usable area. We have since become Sun Hung Kai Properties’ long-term Strategic partner.

 

SCOPE OF PROJECT

Supply, Fabrication and Installation of structural steel stanchions