West Rail Yuen Long Station Property Development (YLTL No. 510)

Posted on December 8th, 2021

The Massive Steel Turntable Structure is to rotate permanent footbridge and vehicular bridge to the designated position, which is right above the life operation of Light Rail. This innovative erection method is unprecedented in Hong Kong.


See more…

H Zentre, 15 Middle Road, Tsim Sha Tsui

Posted on December 8th, 2021


The plot in Middle Road, a former multi-storey car park next to the Sheraton Hong Kong Hotel and Towers is a unique and well located site to be redeveloped into a 22 Storey Ginza-Style commercial complex of gross floor area 42,000 square meters.

The Developer selected Goldwave’s steel structure solution over traditional concrete construction due to the rapid speed of construction schedule, generate higher building efficiency of usable area which translating into value-added economic benefits.

See more…

Shenzhen Qianhai Chow Tai Fook Financial Tower, China

Posted on December 8th, 2021

200 Meters Mixed Use Commercial Complex (45-storey) 

Followed by a great deal of effort had been put into promoting the added value of steel structure. Goldwave was honored to be selected by Hip Hing Construction (China) Co. Ltd. as client’s nominated structural steel contractor to design, fabricate and erect the superstructure of a 200 meters height (45-storey) mixed use commercial complex situated at the prime location in Guiwan area, Qianhai commercial district. 

This project crafted a new milestone of Goldwave to set our first footprint in the map of Greater China. 

SCOPE OF PROJECT

Structural design, supply, fabrication and erection

98 How Ming Street, Integrated Commercial Complex and Grade A Office Development

Posted on December 8th, 2021

Commercial, Office, Retail Development 

Goldwave’s Smart Steel Structure Solution designed for this Mega Commercial Complex demonstrates to the Client how a steel structure can outperform a conventional reinforced concrete solution for this type of project. Faster construction time, greater precision on site due to factory controlled fabrication off site, higher productivity on site, fewer and smaller columns creating more efficient use of area. Earning the trust of Sun Hung Kai Properties as a Long Term Strategic Partner. 

 

 
SCOPE OF PROJECT

Supply, Fabrication and Installation of structural steel stanchions

F2 Water Channel for Third Runway, Hong Kong International Airport

Posted on December 8th, 2021

Goldwave had been successfully delivered a faster, safer, cost effective and environmentally friendly solution spanning from structural design, selection of high mobility of decking system which beyond the expectation of client. This successful project brings us the next opportunity for a new temporary platform project.

SCOPE OF PROJECT  

Supply, Installation and Demolition of Temporary Deep Jet Mixing Platform – F2 Water Channel for Third Runway

Mixed-use Commercial Twin Composite Towers, Cheung Sha Wan NKIL6505

Posted on December 7th, 2021

120 Meters in height and 8,000 Tons of structural steel 


Goldwave offered a one-stop-shop design and build solution(s) for two highly efficient steel frame twin towers. The use of a steel structure could create an additional 5% net leasable area and a ceiling height of up to 3 meters. Basically, the slimmer main columns maximized the flexibility of the internal layouts and enhanced users’ experience. 

SCOPE OF PROJECT  

Structural design, Supply, Fabrication, and installation 

MEGA Plus – SUNeVision iAdvantage Data Center, Tseung Kwan O Data Center

Posted on December 8th, 2021

Followed by the success of promoting the benefits of steel structure to client’s project, the mixed-use commercial development at 98 How Ming Street and recent success project delivery of Government Data Center located at Cheung Sha Wan. Goldwave was honored to be the structural steel contractor for structural design, fabrication and installation of phase I development. We trust that our effective steelwork proposal and solid project references will be considered with high degree of confidence for the next phase development.

Tin Wing Light Rail Station (Heavy Lifting & Skidding System for Temporary Platform)

Posted on December 8th, 2021

Kai Tak NKIL 6568 (Heavy Lifting System – Temporary Working Platform)

Posted on December 8th, 2021

Goldwave’s ingenious heavy lifting system creates a breakthrough to turn “impossible mission” to possible solution. In this project, Goldwave design, fabricate and hoist up 5 irregular service decks within extreme compact spacing (from approx. 10-18 meters) from 5th floor to 28th floor to support the construction of a massive concrete transfer slab permanently in place at 29th floor.

The service decks are also as serves safety working platform for site workers to carry out remaining works for the transfer slap installation. 5 temporary protection platforms are installed as safety measure to mitigate the risk of falling objects to protect workers during the construction period of service decks.  

SCOPE OF PROJECT  

Design, supply, fabrication and installation (Heavy Lifting) 

H-code Pottinger Street, Central

Posted on December 8th, 2021

H Code is a pioneering leisure development that is designed for flexibility and versatility. It is located at upper Pottinger Stone Street in Central, an area of Hong Kong known for its ultra-high density and compact business nature. 

The site was considered not buildable by using traditional building methods because of its site constraints. Goldwave provided an effective steel frame solution which overcame the challenges of geographical complexity as the site is located on a slop; low capacity foundation had been built and tiny site area provided very limited storage for building materials. The 22-storey building structure of 12,632 square meters of gross floor area was completed in 14 months. H-code itself won the building design award from the American Institute of Architects. 

SCOPE OF PROJECT  

Structural design, Fabrication and Installation of structural steel frame