SCOPE OF PROJECT
Supply, Fabrication and On-site Erection
Goldwave’s ingenious heavy lifting system creates a breakthrough to turn “impossible mission” to possible solution. In this project, Goldwave design, fabricates and hoists up 5 irregular service decks within extremely compact spacing (from approx. 10-18 meters) from 5th floor to 28th floor to support the construction of a massive concrete transfer slab permanently in place on the 29th floor.
The service decks also serve as safety working platforms for site workers to carry out the remaining works for the transfer slap installation. 5 temporary protection platforms are to be installed as a safety measure to mitigate the risk of falling objects to protect workers during the construction period of service decks.
SCOPE OF PROJECT
Design, supply, fabrication and installation (Heavy Lifting)
The Massive Steel Turntable Structure measuring 21 meters in diameter was to rotate the permanent footbridge (46 Meters) and vehicular bridge (52 Meters) to the designated position, which was right above the life operation of Light Rail. This innovative erection method was unprecedented in Hong Kong.