West Rail Yuen Long Station Property Development (YLTL No. 510)

Posted on December 8th, 2021

The Massive Steel Turntable Structure is to rotate permanent footbridge and vehicular bridge to the designated position, which is right above the life operation of Light Rail. This innovative erection method is unprecedented in Hong Kong.


See more…

Tin Wing Light Rail Station (Heavy Lifting & Skidding System for Temporary Platform)

Posted on December 8th, 2021

Kai Tak NKIL 6568 (Heavy Lifting System – Temporary Working Platform)

Posted on December 8th, 2021

Goldwave’s ingenious heavy lifting system creates a breakthrough to turn “impossible mission” to possible solution. In this project, Goldwave design, fabricate and hoist up 5 irregular service decks within extreme compact spacing (from approx. 10-18 meters) from 5th floor to 28th floor to support the construction of a massive concrete transfer slab permanently in place at 29th floor.

The service decks are also as serves safety working platform for site workers to carry out remaining works for the transfer slap installation. 5 temporary protection platforms are installed as safety measure to mitigate the risk of falling objects to protect workers during the construction period of service decks.  

SCOPE OF PROJECT  

Design, supply, fabrication and installation (Heavy Lifting) 

Tin Wing Light Rail Station (Pedestrian Steel Bridges)

Posted on December 8th, 2021