Tin Wing Light Rail Station (Heavy Lifting & Skidding System for Temporary Platform)

Posted on December 8th, 2021

Kai Tak NKIL 6568 (Heavy Lifting System – Temporary Working Platform)

Posted on December 8th, 2021

Goldwave’s ingenious heavy lifting system creates a breakthrough to turn “impossible mission” to possible solution. In this project, Goldwave design, fabricates and hoists up 5 irregular service decks within extremely compact spacing (from approx. 10-18 meters) from 5th floor to 28th floor to support the construction of a massive concrete transfer slab permanently in place on the 29th floor.

The service decks also serve as safety working platforms for site workers to carry out the remaining works for the transfer slap installation. 5 temporary protection platforms are to be installed as a safety measure to mitigate the risk of falling objects to protect workers during the construction period of service decks.  

SCOPE OF PROJECT  

Design, supply, fabrication and installation (Heavy Lifting) 

F2 Water Channel for Third Runway, Hong Kong International Airport

Posted on December 8th, 2021

Goldwave successfully delivered a faster, safer, cost-effective and environmentally friendly solution spanning from structural design, selection of high mobility of decking system which exceeded client’s expectation. This successful project brought us the next opportunity for a new temporary platform project.

SCOPE OF PROJECT  

Supply, Installation, and Demolition of Temporary Deep Jet Mixing Platform – F2 Water Channel for Third Runway

Taiwai Station Property Development (Foundation & Temporary Work)

Posted on December 8th, 2021

Along with this vast permanent structure development and bridges interlink construction, the project demanded for substantial scale of temporary platforms, excavation lateral support, and steel ramp to support the construction of new podiums and the basement structure adjacent to the existing rail track of East Rail. Total steel consumption of temporary and permanent works reached 5,000 Tons. 

SCOPE OF PROJECT 

Design, Supply, Fabrication and Installation  

Taiwai MTR Station Property Development (Pedestrian Steel Bridges)

Posted on December 14th, 2021

Goldwave’s project team has a wealth of experience in installing large and wide span footbridges all over Hong Kong. This project comprised two pedestrian bridges at maximum 70 meters in length and to be connected with the existing building structure located on top of Tai Wai MTR station. They connected to the Interchange across Che Hung Mui Road and Mei Tin Road. The installation were completed in several overnights, with professionally coordinated onsite sessions.

SCOPE OF PROJECT 

Design, Supply, Fabrication and Installation
No. of Bridge: 2